The roofs were poured in May 2012. I have been delinquent in taking pictures and posting. So here goes. You can click on a picture to view a bigger size.
 |
| This is the view from one of the balconies |
 |
| The Solar Hot Water Heater and Water Tank |
 |
| Looking West towards the Arabian Sea |
 |
| As you enter |
Each room is made to look like a cottage and clustered like a village with an open space in between.
 |
| Each Bathroom has an opening to the sky where the shower will be located. |
I do have pictures of the reinforcements before the concrete was poured. Will post in a few weeks.
Click on the following links for previous posts:
This post has the beginnings of the upper floor.
Link to pictures of the outside of the house.
Pictures of the inside of the house.