Thursday, January 17, 2013

The structural work is complete

The roofs were poured in May 2012. I have been delinquent in taking pictures and posting. So here goes. You can click on a picture to view a bigger size.
This is the view from one of the balconies
The Solar Hot Water Heater and Water Tank

Looking West towards the Arabian Sea
As you enter
Each room is made to look like a cottage and clustered like a village with an open space in between.
Each Bathroom has an opening to the sky where the shower will be located.
I do have pictures of the reinforcements before the concrete was poured. Will post in a few weeks.

Click on the following links for previous posts:


This post has the beginnings of the upper floor.

Link to pictures of the outside of the house.

Pictures of the inside of the house.