Another improvement today was the plastering of the Staff Bathroom. It was partially done.
The door to the extreme right is the Entrance to the house via the Utility room. Next to it is the Staff Room and next to that is the Staff Bath. The Staff Room and Bathroom are accessible only from outside and have no access to the house. Drivers of visiting guests can utilize these facilities and be comfortable.
To the right are connections for Hot and Cold Water. The sink will be to the left. Instead of tiles, Red Oxide will be used to finish the bathroom. The walls were done today.
The floor will be done next after which the faucets, wash basin and flush will be installed.
No comments:
Post a Comment